Perry Lithgow Partnership (1988) Rochester Cathedral; [Crypt] Bays 33, 40 and 18

View/download PDF: Archive report, figures

Author: Perry Lithgow Partnership

Abstract:

The third phase of conservation of paintings in the crypt was started on 18th January 1988 and lasted 12 weeks. Two main areas were included in this programme of work: firstly the two bays in the north-west corner of the crypt, Nos. 40 and 33 on the ground plan, and secondly, the bay adjoining St. Ithamar’s Chapel – No. 18 on the plan. The work was carried out in conjunction with students from the Courtauld Institute of Art Wall Paintings course, in two groups of three students, each group working for a period of 6 weeks.

To cite this work:
Perry Lithgow Partnership (1988) Rochester Cathedral; [Crypt] Bays 33, 40 and 18. Perry Lithgow Partnership treatment record.

To link to this article: https://rochestercathedralresearchguild.org/bibliography/1988-05

Published online: 8th January 2018
General Queries: jacob.scott@rochestercathedralresearchguild.org

Rights:

Produced by permission of the Dean and Chapter of Rochester Cathedral. All rights reserved to the authors.

Any views and opinions expressed in this work are those of the authors alone and do not necessarily reflect the official policy or position of either the Research Guild or the Dean and Chapter.

Advertisements